Hot Gas and Epoxy Removal Crossword Puzzle
Download and print this Hot Gas and Epoxy Removal crossword puzzle.
Related puzzles:
Browse all Tools / Equipment Puzzles
QUESTIONS LIST:
- burns : these can be the result because of the hot plate and heated shear tool.
- interchangable : the shear tool for the chip dragon is _ .
- spray booth : where should a unit being reworked be blown out to avoid spreading particles in the air?
- ppe : safety glasses and heat resistant gloves are required while using the chip dragon and known as what? (hint: acronym)
- lower : after the microscope has been adjusted, _ the gas nozzle head and align the component under the gas jet 1/2" from the device.
- chisel : what tool do you use to remove epoxy adhesive 100% after taking the components off with the chip dragon?
- collateral : if you are not careful when removing components with the chip dragon, what do we call damage done to other components, bonds, wires or ribbons in the area you are working in?
- clean : what do we do to the chip dragon workstation after each use?
- upright : what position should the gas nozzle and heated shear tool be in before removing the until from the hot plate?
- removed : when removing and replacing components all epoxy needs to be _ before adding more epoxy and the replacement component.
- rework : the procedure applied to a non-conformance that will completely eliminate it and result in a characteristic that conforms completely to the drawing, specification, or contract requirement is known as what?
- freezer : epoxy adhesives will be stored in what set to -40* until use?
- two : any components that has been epoxy attached to a dielectric’s metallization (e.g, gold plated ceramic) may be replaced at a given location how many times?
- four : any element that has been epoxy attached to metal or non-metallized dielectric (e.g, ceramic, pedestals, carriers, tabs, heat sinks) may be replaced at a given location how many times?
- unlimited : for general assemblies populated with epoxy attached elements, what is the maximum time duration exposure at 150°c (per rework) before the elements need to be replaced?
- bonding : any rework performed after which inspection operation has to be inspected again?
- documentation : this is required anytime a component is replaced.
- ncr : elements which have to replaced more than one time require what to be generated? (hint: acronym)